Baltimore Key Bridge #66 – Was the South Pillar really just “stacked blocks”, made to be knocked-over in a mega-event?
Massive clean-cut concrete of South Pillar having zero rebar indicates initial design-to-fail, no?
Massive clean-cut concrete of South Pillar having zero rebar indicates initial design-to-fail, no?
Catastrophically overstressed structural steel cracks and snaps, not melts and wilts.
Where did the steel go? All steel truss height exceeds water and mud depth – No part should be fully underwater.